Project Details:
Multiple sites. Full mechanical and building control system upgrade and retrofit.
Systems: chiller, chilled water coils, hot water coils, central AHU, boilers, dampers, chilled water pumps, hot water pumps, VFD’s, air flow stations, energy valves, VAV’s, DDC system.
Location: Colorado Springs, Boulder
Client: Wells Fargo
Engineer: ESD (Chicago)